United Water Owego Nichols (Apr 2010)

Posted on: April 1, 2010

The need for a second well to serve this community resulted in the design of a 150 gpm well proposed to be located in Kirby Park.  The park is in the flood plain of the Susquehanna River and the Wappasening Creek and special design considerations for the well were required.  Electric power and control cabinets, and chemical treatment are… Continue Reading

United Water Toms River – Berkeley Radionuclide Facility (Apr 2010)

Posted on: April 1, 2010

In March 2010 following rigorous start-up and testing, the UWTR Berkeley Radionuclide Facility was brought on-line.  BS&J designed, obtained permits, and provided engineering services during construction for this project using ion exchange to remove naturally occurring Radium 226, Radium 228, and Gross Alpha in the well water.  The facility is able to treat flows from… Continue Reading