SUEZ Water New Jersey, Inc – West Forest Ave Bridge Water Main Replacement Construction (December 2019)

Posted on: December 28, 2019

Buck, Seifert & Jost, Inc. designed and obtained permits to construct the West Forest Avenue Bridge Water Main Replacement. The existing steel water main is attached to the underside of the bridge over the stream crossing and requires replacement. Construction is expected to begin in September 2020. BS&J will provide engineering services during construction including… Continue Reading

SUEZ Water New Jersey, Inc. – Formal and Regular Dam Inspections (December 2019)

Posted on: December 27, 2019

BS&J conducted the formal dam inspections for two dams, and regular dam inspections at two dams in the Fall 2019. The inspections were attended by BS&J, SWNJ, and representatives of the NJDEP. The formal inspections included underwater dive inspections by JMT and updated stability evaluations. Reports were written for each dam listing existing conditions, observations,… Continue Reading