SUEZ Water New York Inc. – District Metered Area Project, Phase 3 (January 2017)
Having successfully completed phases one and two, BS&J is preparing the design drawings and specifications for the construction of the third phase of District Metered Areas (DMAs) in the SWNY distribution system. Engineering services during construction will follow later in 2017.