Aquarion Water Company of Connecticut – Putnam WTP East and West Clearwell Leak Repairs (March 2020)
BS&J was asked to assist with design, bid, and construction services to repair leaking joints in two potable water clearwell reinforced concrete structures at the Putnam WTP facility. The repair, conducted by Specialty Construction Systems, Inc., included removal of previous repair materials to expose the affected joints, injection grouting and installation of Sikadur Combiflex SG… Continue Reading