Veolia Water New Jersey, Inc – Woodcrest Tank Painting Lambertville, New Jersey (February 2024)

Posted on: February 1, 2024

Buck, Seifert & Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to provide engineering services to design temporary storage and associated piping modifications to allow for the painting of an existing 170,000-gallon water storage tank in Lambertville, New Jersey. The project required system operation / demand analysis, hydraulic modeling, and proposed… Continue Reading

Veolia Water New Jersey, Inc. – Water Main Extension Franklin Lakes, New Jersey – (2023-2024)

Posted on: January 1, 2024

Buck, Seifert & Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to assist with the Analysis, Design, and Construction Services for installing 4,200LF of 12” water main in Franklin Lakes, New Jersey. The analysis was completed in early 2023. The final design, material list, traffic control suggestions, and construction specifications were… Continue Reading

Veolia Water New Jersey, Inc. – Water Treatment Chemical Storage Haworth Water Treatment Facility – Haworth, New Jersey (2018-2023)

Posted on: December 1, 2023

Buck, Seifert and Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to provide Design, Permitting, Drawing, and Technical services to support the additional storage volume of water treatment chemicals at the Haworth Water Treatment Plant (HWTP) in Haworth, New Jersey. Due to property size restraints, to meet this NJDEP regulation, additional… Continue Reading

Veolia Water New York, Inc. – Tank Mixer Installation Valley Cottage, NY (2023 – 2024)

Posted on: December 1, 2023

Buck, Seifert & Jost, Inc., d.b.a. BS&J Engineers, P.C. (BS&J) was retained by Veolia Water New York, Inc. (VWNY) to assist with the design, permitting, and construction services for the installation of an active tank mixer in a 1.5-million-gallon Ground Storage Tank near Valley Cottage, NY. The project was completed in Winter, 2023.

Veolia Water New Jersey, Inc. – Crescent Park Tank Painting West Milford Township, New Jersey (October 2023)

Posted on: October 1, 2023

Buck, Seifert & Jost (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to assist with engineering analysis and design services needed to install and maintain a temporary operating system that could support the removal of a 190,000-gallon storage tank from service in Crescent Park, West Milford, New Jersey. BS&J recommended the use of… Continue Reading

Veolia Water New Jersey, Inc. – Water Main Relocation North Bergen, New Jersey – Hudson Tunnel Project (2023-2025)

Posted on: May 1, 2023

Buck, Seifert & Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. to provide Engineering Evaluations and Construction Services related to the relocation of two (2), twelve-inch diameter water mains in North Bergen, New Jersey. The water main relocation is Phase 2 of the ongoing project near Tonnelle Avenue to connect rail service… Continue Reading

Buck, Seifert & Jost, Inc. – Promotions announced for corporate officers (May 2023)

Posted on: May 1, 2023

Advancing the high standards of performance upon which BS&J has built its reputation since its founding in 1904 by Nicholas S. Hill, Jr., a pioneer in the field of waterworks and sanitary engineering, we are pleased to announce the following promotions in the image on the left. They have the continuing support of Ron and… Continue Reading

Veolia Water New Jersey, Inc. – Western Lower Pumping Station Improvements (December 2022)

Posted on: December 30, 2022

Engineering design and permitting efforts continue for improvements to the lower pumping station at Western Reservoir.  Improvements include increased pumping capacity, variable frequency drives, and standby power.

Veolia Water New Jersey, Inc. – Pump Station Building Western Water Storage Reservoir – Woodcliff Lake, New Jersey (2020 – 2022)

Posted on: December 1, 2022

Buck, Seifert and Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to provide Design Services related to the construction of a structure to cover outdoor pumps at the Western Water Storage Reservoir in Woodcliff Lake, New Jersey. After receiving the approvals from the Planning Board, obtaining the necessary permits, and securing… Continue Reading

Veolia Water New Jersey, Inc. – Temporary and Permanent Treatment for PFAS (June 2022)

Posted on: June 30, 2022

BS&J is providing design, permitting, and engineering services during construction for several groundwater well locations requiring treatment for polyfluoroalkyl substances – known as PFAS. Several temporary treatment systems have been installed.  Construction of the permanent systems will begin in 2023.