Suez Water New York – CSX Railroad Crossing, Haverstraw, NY (May 2016)

Posted on: May 2, 2016

BS&J provided engineering services to inspect the construction of a water main replacement through an existing casing pipe beneath the CSX railroad. The work required special attention due to close proximity to this heavily traveled freight line.

Suez Water New Jersey – Haworth WTP Sodium Hypochlorite Tank Liner Replacement (May 2016)

Posted on: May 1, 2016

The scheduled replacement of the liners in these two reinforced concrete tanks provided the opportunity to inspect the tanks and replace the secondary containment coating systems. BS&J provided engineering services to specify the new coating and liner, and inspect the tanks both existing and completed conditions.

Suez Water New Jersey – Englewood Cliffs Tank Painting (April 2016)

Posted on: April 2, 2016

BS&J provided hydraulic modeling, design, and startup assistance associated with implementation and testing of improved surge relief capabilities and two utility powered and two diesel driven temporary pumping units both with variable speed drives at the SWNJ Hillside and Fairview Pumping Stations. These facilities serve densely populated areas in eastern Bergen County, NJ. This additional… Continue Reading

Suez Water Lambertville – Swan Street Pumping Station (April 2016)

Posted on: April 1, 2016

Improvements to the raw water intake from the Delaware and Raritan Canal and the addition of a pumping unit are being designed by BS&J. As part of this work, both temporary and permanent repairs to the pumping station building masonry structure are being designed.

Gannett Fleming and New Jersey American – Swimming River WTP Clearwell and Pumping Station (March 2016)

Posted on: March 2, 2016

In association with Gannett Fleming, Inc. and Amy S. Greene Environmental Consultants Inc., BS&J is providing engineering services related to permitting including: NJDEP – Permit To Construct/ Modify/Operate Public Water Works Facilities; Land Use Regulatory Program (LURP) – Flood Hazard Area Individual Permit With Hardship Exception And Riparian Zone Compensation Plan, Freshwater Wetlands Letter Of… Continue Reading

Suez Water New Jersey – Improvements to Woodcliff Lake Dam (March 2016)

Posted on: March 1, 2016

Over $20 million of construction was completed including overtopping protection on the earth embankment for an auxiliary spillway, rehabilitation of the low level outlet, and other improvements including a new fishing pier and rescue boat ramp. BS&J’s services included design, construction services, and operation and maintenance training for the new facilities.

Suez Water New Jersey – Water Main Replacement Design and Construction Services (2015 and 2016)

Posted on: January 1, 2016

As part of planned distribution system improvements, BS&J completed the design of several water main replacements in the SWNJ system. BS&J also provided on-site inspection to monitor daily construction activities and prepared as-built deliverable documents.

Suez Water New York – Improvements to Ramapo Valley Well Field Well No. 84 (December 2015)

Posted on: December 2, 2015

Design, construction management, start-up and testing were completed by BS&J for the addition of bag and cartridge filters and ultra-violet (UV) light treatment at Well No. 84.

Suez Water New Jersey – New Durham Pumping Station Improvements (December 2015)

Posted on: December 1, 2015

BS&J is designing improvements to the existing 25 million gallon per day (mgd) New Durham Pumping Station in North Bergen, NJ including replacement of electrical switchgear, pumping units, standby generator, suction and discharge headers, metering equipment, and new additional improvements to the surge relief system. The facility must remain operational while the improvements are undertaken… Continue Reading

Suez Water Vernon – Water Main Extensions (October 2015)

Posted on: October 1, 2015

BS&J designed and permitted modifications to existing dry water main extensions originally installed in 2005 and connections to existing distribution piping along State Highway Route 94. New work included a vault with pressure reducing valve, flow meter, and provisions to separate the new water mains placed in service from other existing dry water main extensions… Continue Reading