News

Aquarion Water Company of Connecticut – Putnam WTP East and West Clearwell Leak Repairs (March 2020)

Posted on: March 27, 2020

BS&J was asked to assist with design, bid, and construction services to repair leaking joints in two potable water clearwell reinforced concrete structures at the Putnam WTP facility. The repair, conducted by Specialty Construction Systems, Inc., included removal of previous repair materials to expose the affected joints, injection grouting and installation of Sikadur Combiflex SG… Continue Reading

SUEZ Water New York Inc. – Ramapo Valley Well Field (February 2020)

Posted on: February 27, 2020

Construction was competed for the addition of ultraviolet (UV) light and cartridge filter treatment for one of the wells in the RVWF determined to be Groundwater Under the Direct Influence of Surface Water (GWUDISW). BS&J completed the design and assisted during construction. The design included an elevated structural support platform for the Treatment Building approximately… Continue Reading

SUEZ Water New Jersey, Inc – Vernon Valley Pump Station Design (January 2020)

Posted on: January 27, 2020

Additional firm capacity is being evaluated for this system with wells and a booster station. BS&J is currently preparing preliminary design and permit application documents.

SUEZ Water New Jersey, Inc – West Forest Ave Bridge Water Main Replacement Construction (December 2019)

Posted on: December 28, 2019

Buck, Seifert & Jost, Inc. designed and obtained permits to construct the West Forest Avenue Bridge Water Main Replacement. The existing steel water main is attached to the underside of the bridge over the stream crossing and requires replacement. Construction is expected to begin in September 2020. BS&J will provide engineering services during construction including… Continue Reading

SUEZ Water New Jersey, Inc. – Formal and Regular Dam Inspections (December 2019)

Posted on: December 27, 2019

BS&J conducted the formal dam inspections for two dams, and regular dam inspections at two dams in the Fall 2019. The inspections were attended by BS&J, SWNJ, and representatives of the NJDEP. The formal inspections included underwater dive inspections by JMT and updated stability evaluations. Reports were written for each dam listing existing conditions, observations,… Continue Reading

SUEZ Water New Jersey, Inc. – Northeast Tank Pumping Station Construction (November 2019)

Posted on: November 27, 2019

Construction was completed on a new 10 million gallon per day (mgd) firm capacity pump station adjacent the existing Northeast Tank. The design and construction included provisions for future chemical feed systems. BS&J completed the design and provided engineering services during construction, completed in November 2019 by J. Fletcher Creamer & Son, Inc.

SUEZ Water New Jersey and New York Inc – 2D Hydrologic Modeling (October 2019)

Posted on: October 27, 2019

BS&J continued hydraulic modeling for four dams using a HEC-RAS unsteady 2D hydraulic model to update inundation limits for Emergency Action Plans (EAPs).

SUEZ West Milford – Emergency Operations (September 2019)

Posted on: September 27, 2019

On-site emergency assistance was requested during construction of temporary facilities to support hydrant flushing and emergency distribution system maintenance. Review of system operation, pressure regulating valve replacement, surge relief, and creation of hydraulic profile was performed.

SUEZ Water New York Inc. – Regular Dam Inspections (June 2019)

Posted on: June 27, 2019

BS&J conducted the regular dam inspections at four dams together with SWNY. Reports were written for each dam listing existing conditions, observations, and recommendations.

SUEZ Water New York Inc. – Grandview Wells Water Treatment (June 2019)

Posted on: June 21, 2019

Construction was completed on an updated water treatment process for two wells including a new building, treatment vessels, and 16-inch diameter ductile iron pipe for chlorine contact time. BS&J completed the design and provided engineering services during construction, testing, start-up, and completion certification to the local Department of Health.