News

United Water Toms River – Holly Pumping Station (Mar 2009)

Posted on: March 1, 2009

BS&J completed the design and permitting of a replacement to the existing Holly Pumping Station.  The new station has three vertical turbine pumping units within the footprint of an existing building that was reconstructed as the new station.  The total pumping capacity was increased from 4 to 6 MGD.  The dedication of the station and Holly Facility treatment upgrades was held on October 29, 2011.