News

United Water New York – Ultraviolet Light Installation at Ramapo Well No. 29 A (October 2014)

Posted on: October 1, 2014

Our work for United Water New York included the addition of ultraviolet (UV) light and cartridge filters for a well that was determined to be Groundwater Under Direct Influence of Surface Water. Buck, Seifert & Jost, Inc. completed its third UV light installation including design, permitting, and engineering services during construction. The well is a 1,400 gpm well and in addition to UV and cartridge filters, work included raising the well and treatment components above the 100-year flood elevation, and the construction of new chlorine contact piping. The work was completed by J. Fletcher Creamer & Son, Inc.