News

SUEZ Water New York Inc. – Ramapo Valley Well Field Well No. 97 (August 2018)

Posted on: August 26, 2018

Construction began in August 2018 for the addition of ultraviolet (UV) light and cartridge filter treatment for a Groundwater Under the Direct Influence of Surface Water (GWUDISW) Well located in Rockland County, NY. BS&J completed the design and is now providing assistance during construction. BS&J designed an elevated structural support for the proposed Treatment Building that is approximately 13 ft above grade extending above the Ramapo River floodway elevation. Construction is expected to be completed in theFall of 2019.