News

Suez Water Vernon – Water Main Extensions (October 2015)

Posted on: October 1, 2015

BS&J designed and permitted modifications to existing dry water main extensions originally installed in 2005 and connections to existing distribution piping along State Highway Route 94. New work included a vault with pressure reducing valve, flow meter, and provisions to separate the new water mains placed in service from other existing dry water main extensions to remain dry. The new work allowed the connection of several new businesses in Vernon.