Buck, Seifert & Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to provide engineering services to design temporary storage and associated piping modifications to allow for the painting of an existing 170,000-gallon water storage tank in Lambertville, New Jersey.
The project required system operation / demand analysis, hydraulic modeling, and proposed site work to install temporary storage tanks on-site to maintain continuous service to the distribution system during tank painting operations.
The project has an expected completion date of Summer 2024.