Buck, Seifert, and Jost, Inc. (BS&J) was retained by Veolia Water New Jersey, Inc. (VWNJ) to provide an evaluation and design services for the installation of fifteen (15) Electric Vehicle (EV) charging stations at their Devoe Facility.
BS&J completed the design and prepared a set of contract bid documents for 15 Level 2 and Level 3 Electric Vehicle charging stations in the Summer 2024.
Project construction is scheduled to take place in the Fall, 2024.